Pneumatic Logic Sequencing Circuit

PNEUMATIC LOGIC SEQUENCING CIRCUIT

Setup Preventive Maintenance
 

Prior to Creative Systems Optimized, LLC intervening, an operator would have to manually turn the valves off. often they would forget to turn the m back on in the correct sequence, resulting in large tanks being contaminated. Thousands of gallon tanks would have to be discarded causing a loss of production and added expense.

Designed for the purpose of routine maintenance which is a part washdown cycle by turning valves off and on of the machine, in sequence and returns the machine to the starting state after 30 minutes. In a washdown mode all the internal parts off the machine goes through a wash cycle. The machine internal is washed down prior the next setup. The wash downl is done between setups. All the internals of machine are rinsed down before the next setup. The valves are turned off in a certain sequence and returns back to auto mode after 30 minute washdown cycle .

Custom pneumatic logic training module developed to train maintenance personnel with the ability to diagnose pneumatic logic systems through trouble shooting.